Downloads - Tenders & Reports
GUIDELINES ON 20% SUB-CONTRACTING
UPGRADING OF D153 FROM GREAT EAST ROAD AT MOONO POLICE CHECK POINT VIA PALABANA TO D151 AT LUKOSHI
TENDER FOR THE SUPPLY AND DELIVERY OF ROAD INSPECTION EQUIPMENT
Construction of a Bridge at Mufuchani across the Kafue River in Kitwe
Construction of a Bridge at Mufuchani across the Kafue River in Kitwe
Roads Magazine, Edition 7 January - March 2013
PUBLIC NOTICE - ROAD CLOSURE LUSAKA- CHIRUNDU ROAD
VENDOR RATING SYSTEM DESIGN CONSULTANT PERFORMANCE RATING TOOL KIT
VENDOR RATING SYSTEM SUPERVISING CONSULTANT PERFORMANCE RATING TOOL KIT
VENDOR RATING CONTRACTOR PERFORMANCE RATING TOOL KIT
| Property | Value |
| Name | ANNUAL WORKPLAN 2013 |
| Description | This document presents the 2013 Road Sector Annual Work Plan (RSAWP) which covers the period from January to December 2013. The work plan draws its resources from the Medium Term Expenditure Framework and has been aligned to the Nation's Sixth National Development Plan (SNDP) whose strategic focus is human and infrastructure development. The total amount of resources for the 2013 RSAWP is ZMK3.288 trillion comprising 25% in external financing (Loans and Grants) and 75% from local resources in the form of direct GRZ funding from the Treasury and the Road Fund. |
| Filename | AWP 2013.pdf |
| Filesize | 1.13 MB |
| Filetype | pdf (Mime Type: application/pdf) |
| Creator | Bisenti |
| Created On: | 01/18/2013 18:02 |
| Viewers | Everybody |
| Maintained by | Editor |
| Hits | 1539 Hits |
| Last updated on | 01/28/2013 19:33 |
| Homepage | |
| CRC Checksum | |
| MD5 Checksum |

