Archive for category: Uncategorized

Untitled (42)

PRESIDENT HICHILEMA LAUNCHES WORKS TO UPGRADE TO BITUMINOUS STANDARD THE SOLWEZI-KIPUSHI ROAD AND BORDER INFRASTRUCTURE

President Hakainde Hichilema has today officially launched construction works to upgrade to bituminous standard 111 kilometres of the Solwezi-Kipushi ...

Read More 0
Untitled (41)

GOVERNMENT THROUGH RDA SIGNS ROAD CONTRACTS FOR THE UPGRADING OF CHIKANKATA ROAD AND SAMFYA-KASABA ROAD VIA LUBWE

The Government through the Road Development Agency (RDA) has signed two contracts for the upgrading of the D387 Road from T1 to Chikankata in Southern...

Read More 0
Untitled (45)

GOVERNMENT SIGNS CONCESSION AGREEMENT FOR CONSTRUCTION ON THE MUTANDA-KASEMPA-KAOMA ROAD

The Government through the Road Development Agency (RDA) has signed a Concession Agreement for the construction to bituminous standard the 371 kilomet...

Read More 0
Untitled (36)

EIZ CONDUCTS A TECHNICAL AUDIT ON LUSAKA-NDOLA DUAL CARRIAGEWAY

…emphasizes on engagement of an independent Engineer The Engineering Technical Committee has undertaken an audit on the Lusaka-Ndola dual car...

Read More 0